Likusasa was awarded the contract to design and build hybrid solar powered co-location BTS sites, with an average power consumption of 18 kW, for the Posts and Telecommunications Regulatory Authority of Zimbabwe (POTRAZ).
Find out more
Likusasa designed and built a trial hybrid solar powered outdoor BTS site, with an
average power consumption of 1500W, for Econet Zimbabwe.
Likusasa was awarded the contract for the construction of the WACS consortium cable landing station in Lagos, Nigeria. Pre-fabricated buildings, supplied by Emerson were used for the equipment rooms.
Find out moreRead a recent TowerXchange interview with Gary Staunton, Group CEO