Lead EPC is a member of the Likusasa Group.
Likusasa was awarded the contract to design and build hybrid solar powered co-location
BTS sites, with an average power consumption of 18 kW, for the Posts and Telecommunications
Regulatory Authority of Zimbabwe (POTRAZ).
Likusasa designed and built a trial hybrid solar powered outdoor BTS site, with an
average power consumption of 1500W, for Econet Zimbabwe.
Likusasa was awarded the contract for the construction of the WACS consortium cable
landing station in Lagos, Nigeria. Pre-fabricated buildings, supplied by Emerson were
used for the equipment rooms.